Well, I didn't get everything I wanted to done today, bad pain day, but I did get the entire fridge scrubbed out, ran all the shelves and all but the last drawer through the dishwasher (gotta go back down there in 3 zomnuts to swap them out), pulled everything that was expired or questionable, and completely changed how the shelves are positioned and reorganized everything lol. And hubby did the kitchen floor, he wasn't feeling great so he slept way in and didn't get to the hall and living room. Oh well. Microwave, oven, and air fryer tomorrow, along with putting away the rest of the random stuff sitting on the deep freezer. Putting stuff away is more than likely going to require reorganizing some of the cabinets so that'll be fun lol. Also ordered cabinets to replace the single wire shelf in the laundry area, but I'm planning on painting that and putting down some of the spare LVP from the living room in there before I hang them since I'm gonna have to pull the washer and dryer out anyways
kitchen redecorating supplies will be here this weekend so I gotta get the wallpaper down from the two walls over the counters at least so I can prep for the backsplash. Busy busy lol.
I'm doing two of these in this space and painting the walls in there this same blue as the lower portion of the stairs.
View attachment 1529625View attachment 1529626View attachment 1529627