ok well put on some gloves and wiped down the parts with some alcohol,took stock of the screws n things. had of course no 18 gauge wire,transformer/driver (which i paid for,100USD ) ,and no thermal grease/ thermal pads. got a cpl tubes of artic silver 5 coming. due saturday.

other than that this is my partial build so far. hopefully ill get all by this weekend again so I can finish. very simple thus far as you can see,not too much n the tech dept. atm. but we did decide pop rivets were the way to go to join the two halves of the frame together. screwed on the box,and syncs and placed the driver for tapping holes or drilling them.

ill go and get some new 18G wire and then this weekend by sunday evening I hope to be done.

035.JPG
036.JPG
037.JPG
038.JPG
039.JPG
041.JPG
 
Back
Top