INH Mods grow.........yey............2 extreme gene lines man.............and in good hands to.....................
Just wanted to air this to you INH................with the size of these new strains it will become "dangerous" for the plants survival, vis r vis, "Snappages of weighty bud laden Appendages" !..........therefore the following has been thought up by me, as a sensible answer to the problem, suffered by S-B, and many others; What about the following suggestion; Ps; didant want to put in Hydro section as i aint a hydro bodderidge "Yet".......but i am gunna trial this on me next grow AutoX of course...!!...
View attachment 157175
With the divert valve waste can be lifted in 10ltr chunks much easier to work with. The 1000 ltr/hr pump is set to come on 15mins per hour to re-circulate the res minerals. If the big boy drinks 5-6ltrs day the twin res will only go down a little comparatively. All PH EC can be set in the "Outside Cab" management res. As are refills/flushes, and importantly, "Res Water Nutrient Solution Heating" if required in the management res. IMPORTANTLY it means no lifting of the culture res lid leading to breakages. In addition LST & bow supports can be used above the DWC 1, as it wont be moved very often etc..so no losses, but good water management and nutrient circulation & control though...no need to keep fully opening the cab door dropping temps.....AB........
Note; Recommended to use 2no 25mm return flow pipes from culture res.
WHAT ARE THE PRO'S & CONS Guy's ??.........AB.......hope you don't mind me airing this INH.........though it might be useful toya DWC culture pro's........AB..