So, I am in the process of upgrading my tent. I was tired of working in the smoldering Summers and freezing Winters in my garage so I decided to partition it off and build a nice climate controlled space. I am not finished yet but am getting close and figured I would share my progress so far. The external is done with the exception of plaster and the inside is about 50% done. Still some insulation and drywall to go. All the electrical has been run but still needs to be terminated. I hope if everything goes well tomorrow, I will be finished expect for the mud and paint. So, on to the show.
This is what my spot looked like before I started.
After the storage shelf came down.
Framing up the first wall.
Framing up the second wall.
Drywall
Dropping in the electrical
Second wall finished.
The inside
So, that was how last weekend and this weekend was spent.
This is what my spot looked like before I started.

After the storage shelf came down.

Framing up the first wall.



Framing up the second wall.


Drywall

Dropping in the electrical


Second wall finished.

The inside


So, that was how last weekend and this weekend was spent.